151 Poole Road, Ste. 100 Leland, NC 28451
P: 910.383.1044
F: 910.383.1045

Cape Fear River Waterline Crossing

The Cape Fear River Waterline Crossing Project extended new waterlines from historic Fort Caswell to Bald Head Island.  The project included a water master meter, booster pump station, new disinfection process and installation of 2-miles of waterlines under the Cape Fear River near the confluence with the Atlantic Ocean. Cape Fear Engineering provided engineering, survey, project management, permitting, and construction administration services.